Mechanical equipment packages
Define operating duty, capacity and interfaces so supplier capability can be checked against the actual service.
INDUSTRY CONTEXT
EPC procurement often requires coordinated RFQs across several equipment packages and suppliers. The key is to keep technical compliance, deviations, documentation, commercial terms, delivery schedules and vendor follow up connected to one project requirement structure.

INDUSTRY CONTEXT
EPC sourcing works best when each package has a clear technical basis, document list, commercial boundary and delivery responsibility, while the overall project keeps supplier interfaces and milestone tracking visible.
SOURCING SCOPE
The sourcing scope can support multiple RFQs and vendor packages under one project requirement, while each package retains its own technical basis, documentation list, exclusions and delivery responsibility.
Define operating duty, capacity and interfaces so supplier capability can be checked against the actual service.
Compare materials, construction, ratings and project specifications rather than relying only on catalogue availability.
Review pressure, flow, sealing or control requirements together with applicable standards and documentation.
Check process conditions, heat transfer or utility interfaces, materials and performance guarantees stated in the RFQ.
Confirm design conditions, materials, nozzles/interfaces, fabrication code and required certificates or vendor documents.
Align measuring range, accuracy, process connection, hazardous area classification and communication requirements where applicable.
Confirm voltage, frequency, motor/load duty, protection, area classification, interfaces and required electrical documentation.
Define I/O, protocol, control philosophy, panel scope, redundancy and integration requirements before technical comparison.
Where cooling is part of the plant duty, define refrigeration load, temperature levels, heat rejection, controls and site conditions.
RELEVANT ENGINEERING EQUIPMENT
Equipment examples are illustrative. Final selection depends on the actual duty, specifications, site conditions and approved project scope.
Compressor selection should be checked against refrigeration duty, temperature levels, capacity, refrigerant, cooling method and the project control requirement.
Metalex product reference ↗Alternative compressor configurations should be reviewed against the operating envelope, staging, driver, utilities, controls and documentation required for the duty.
Metalex product reference ↗Where another compressor series is shown, confirm the same operating basis and compare capacity, temperature range, cooling arrangement and service requirements.
Metalex product reference ↗Condenser selection should follow heat rejection duty, ambient design conditions, water strategy, materials, fan control and site constraints.
Metalex product reference ↗Pressure vessel selection should follow system duty, design pressure and temperature, materials, nozzle arrangement, inspection and documentation requirements.
Metalex product reference ↗Valves, level devices and purgers should be matched to refrigerant service, pressure class, materials, connection standard and control philosophy.
Metalex product reference ↗Refrigerant pumps and circulation equipment should be evaluated against circulation rate, head, refrigerant, operating temperature, motor arrangement and control scope.
Metalex product reference ↗TECHNICAL PROCUREMENT
Before recommendation or order release, make sure each package has a clear compliance position, deviation list, document schedule, commercial basis, delivery milestone and interface owner.
FAQ
Send the RFQ or specification where available, plus duty conditions, materials, quantity, project location, required documentation, inspection scope and target delivery. If the exact equipment is not known, send the process or application requirement.
Yes. The equipment lists are examples of sourcing capability, not a closed catalogue. A drawing, datasheet or technical brief is enough to start the discussion.
The comparison should cover technical compliance, deviations, documentation, commercial terms, delivery, inspection requirements and the project specific factors defined in the RFQ.
No. One Metalex is an international sourcing and procurement proposition. Metalex refrigeration equipment is shown where it is genuinely relevant to an industrial cooling or process cooling duty; other industrial equipment is sourced according to the requirement.
Yes. Multi vendor requirements can be coordinated under one requirement structure, which is particularly useful for EPC and industrial plant procurement.